The San Francisco County Transportation Authority (Transportation Authority) will receive sealed construction bids for the TORPEDO BUILDING AND PIER E2 PROJECT. The revised Bid Submission Deadline is Tuesday, October 15, 2024 at 2:00 p.m. (PDT). An electronic bidding process has been adopted for this solicitation. Paper bids will not be accepted. Electronic bids shall be submitted through bidexpress.com. All bidders must register on bidexpress.com and create a Digital ID through Bid Express to submit a bid. It can take up to five (5) business days to process your Digital ID and it is highly recommended that a Digital ID be active 48 hours in advance of submitting an electronic bid. Costs associated with obtaining said Digital ID and submitting a bid using Bid Express shall be the sole responsibility of the bidder. Contract Documents will be available here. And addenda issued for this project will also be available on this website. Bid forms for this work will be found and completed here

Bidder inquiries can be submitted in BidExpress by Tuesday, October 8, 2024 at 10:00 a.m. (PDT).

Bids will be opened electronically and read aloud on Tuesday, October 15, 2024 at 2:00 p.m. (PDT) at the virtual meeting platform Zoom. Attendees can register here.

The Project consists of 2 adjacent projects: Package 1 - Torpedo Building Preservation Improvements and Package 2 - Reconstruction of the Pier E-2 Parking Lot Site on Yerba Buena Island, in the City and County of San Francisco.

Package 1 - Torpedo Building Preservation Improvements - Work includes removing and replacing existing corrugated metal roof and existing wood fascia trim, removing and repairing offsite all existing wood windows, trims, hardware and replace existing single glazing with new single glazing to match, remove existing barn doors and replace with new aluminum storefront frames and insulated windows and doors, install new plywood framed window protection cover attached to repaired windows. Refer to Bid Book Volume 2 of 3 for the technical specifications related to Package 1.

Package 2 - Pier E-2 Improvements - Reconstruction and expansion work of the Pier E-2 parking lot includes excavation, concrete curbs, gutters and sidewalks, pavement section, signing and striping, construction of a concrete utilidor to carry utilities, utility lines including storm, sanitary sewer including new lift station, potable water including fire hydrant, electrical and communication lines, connections to existing City systems, storm water treatment facilities, erosion control, landscaping, fences, gates and railing, and a pre-fabricated modular bathroom with drinking fountain. Refer to Bid Book Volume 3 of 3 for the technical specifications related to Package 2.

The Engineer’s cost estimate is approximately $7,400,000. A Class A Contractor’s license is required and the successful bidder must pay prevailing wages.

The project includes an aspirational Disadvantaged Business Enterprise/Small Business Enterprise goal of 22%.